Summary Comment for Issue #124
This comment can be added to issue #124 to explain the situation and mark it as the canonical tracking issue.
🤖 Automated Triage Summary
This issue is one of 20+ duplicate "Production Deployment Failed - Rollback Required" issues automatically created by a misconfigured workflow between December 27, 2025.
Root Cause Analysis
The gated-deployment.yml workflow's rollback-preparation job had an incorrect condition that triggered on any upstream job failure, not just actual production deployment failures.
Problem:
rollback-preparation:
needs: [deploy-production]
if: failure() # ❌ Triggers on ANY failure in the workflow
Solution:
rollback-preparation:
needs: [deploy-production]
if: needs.deploy-production.result == 'failure' # ✅ Only triggers if deploy-production fails
What Actually Happened
All 20+ issues were triggered by pre-deployment validation failures (specifically, Prisma client generation errors), not actual production deployment failures. The production deployment never ran.
Resolution
- ✅ Workflow Fixed: Updated
.github/workflows/gated-deployment.ymlto only create rollback issues when production deployments actually fail - ✅ Documentation Created: See
docs/triage/2025-12-27-duplicate-deployment-issues.mdfor full details - ⏳ Cleanup Pending: Run
scripts/triage-duplicate-issues.shto bulk-close duplicate issues #92-#122
Keeping This Issue Open
This issue (#124) is being kept open as the canonical tracking issue for:
- Documenting what happened
- Tracking the resolution
- Serving as a reference if similar issues occur
All other duplicate issues (#92-#122) should be closed with an explanatory comment.
Action Items
- Identify root cause
- Fix the workflow
- Document the issue
- Close duplicate issues using the triage script
- Monitor next deployment to verify fix works
No Action Required
Important: No actual production deployments failed. These were all false positives from the misconfigured workflow.
See the full triage documentation for more details.